Group Eight Engineering Limited

Royalcor Steel, Puslinch

Design-build, steel warehouse addition

Group Eight was retained to provide structural engineering services for the 54,000 ft2 warehouse addition to the Royalcor Steel facility. Our assignment included design, specifications, general construction review and co-ordination with other disciplines and the contractor for this design-build project.

The structural design included the installation of two, 10-tonne, high-speed cranes that are used for moving structural steel tubes within this facility and onto trucks for shipping. The design of the 33 ft. high, 1-storey addition also accommodates a 12 ft. 'across site' elevation difference by utilizing various foundation wall elements and retaining walls. Future plant expansion was provided for within the design. Office areas, employee Lunchroom and washroom facilities were also part of the addition.

This design-build project was completed within the agreed budget and 6-month schedule.


  Group Eight Engineering Limited

Top of Page


For higher resolution printing purposes, this experience sheet is available in PDF format. If you are using Microsoft Internet Explorer, place your cursor over this link and press the right mouse button. Choose  "Save Target As" and save it to your computer's hard drive.  If you are using Netscape, follow the same steps as above, but choose "Save Link As".

The Adobe Acrobat Reader is required to view PDF files and may be downloaded at no cost from www.adobe.com.

Get Acrobat


Profile | Services Available | Structural | Mechanical | Electrical | Experience | Contact Us | Home |Previous Page
Copyright
© 2000 Group Eight Engineering Limited. Last Revised: June 30, 2004