Group Eight Engineering Limited

Philip Services Corp., Hamilton

Mega auto shredder process facility

As prime consultant, Group Eight was responsible for structural, mechanical and electrical engineering services for the new mega auto shredder process facility. The work included planning, site development, design, specifications and field review.

The facility consists of a 3-storey, 6,000 ft2 operations building and a 120,000 ft2 process site. Electrical, mechanical and structural teams worked closely together to ensure all design services were optimised, co-ordinating with an equipment consultant from Texas, USA and equipment suppliers from around the world. Engineering work included underground electrical and hydraulic lines; power supply for the 6,000 horsepower motor; a water supply system for dust scrubbing and fire protection; a 3-stage, outdoor air supply system providing ventilated air and positive room pressurization to the shredder motor area; and a special foundation design for the shredder, electric motor and other equipment.


  Group Eight Engineering Limited

Top of Page


For higher resolution printing purposes, this experience sheet is available in PDF format. If you are using Microsoft Internet Explorer, place your cursor over this link and press the right mouse button. Choose  "Save Target As" and save it to your computer's hard drive.  If you are using Netscape, follow the same steps as above, but choose "Save Link As".

The Adobe Acrobat Reader is required to view PDF files and may be downloaded at no cost from www.adobe.com.

Get Acrobat


Profile | Services Available | Structural | Mechanical | Electrical | Experience | Contact Us | Home | Previous Page  
Copyright
© 2000 Group Eight Engineering Limited. Last Revised: June 30, 2004