Group Eight Engineering Limited

Hamilton Health Sciences, General Site

Heart Investigation Unit/Surgical Suite Expansion

Group Eight was responsible for mechanical and electrical preliminary design, design development, contract documents, contract administration and site review.

The project will provide 4 new Cardiac Catheterization Suites, 2 new Open Heart OR's, 32 Patient Care Stretcher Bays, and support facilities, including offices, a new Main Entrance and Lobby for the Hospital, with space for future food and retail services.

Mechanical systems include HVAC; plumbing & drainage; medical gases, including an expansion of the Hospital's central supply; sprinkler & standpipe equipment; and a DDC control system.

Electrical systems include power distribution; interior/exterior illumination; patient/nurse Communication; structured cabling; and addressable fire alarm.

The project consisted of multiple phases and sequencing of the work, allowing operations to be maintained during construction.


The $12 million project consists of a 36,300 ft2 addition including a 1-storey vertical addition to the existing main entrance with an adjacent 2-storey addition and approximately 11,900 ft2 of renovation.

Rendering is courtesy of Vermeulen/Hind Architects.

  Group Eight Engineering Limited

Top of Page


For higher resolution printing purposes, this experience sheet is available in PDF format. If you are using Microsoft Internet Explorer, place your cursor over this link and press the right mouse button. Choose  "Save Target As" and save it to your computer's hard drive.  If you are using Netscape, follow the same steps as above, but choose "Save Link As".

The Adobe Acrobat Reader is required to view PDF files and may be downloaded at no cost from www.adobe.com.

Get Acrobat


Profile | Services Available | Structural | Mechanical | Electrical | Experience | Contact Us | Home |Previous Page
Copyright
© 2000 Group Eight Engineering Limited. Last Revised: June 30, 2004